LocatePrime

    Ranking topic

    Best Cities for Data Centers

    Power-first data center market evidence from CBRE H1 2026, plus sourced industrial power price, state incentive status and grid-market context.

    Data updated:

    Geography: CBSA (metropolitan statistical area), OMB Bulletin 23-01 (July 2023) — never city limits.


    Publication status

    Underlying Data, No Ordered List Yet

    An ordered list for data centers will be published once the indicators most relevant to data centers are loaded. Until then, this page shows the underlying data.

    Select a column heading to sort. Default view is alphabetical by CBSA title.

    Best Cities for Data Centers: underlying sourced indicators
    State convention

    Atlanta-Sandy Springs-Roswell, GA Metro Area

    CBSA 12060
    7.21 cents/kWh18 of 503.2%3.4%Georgia

    Austin-Round Rock-San Marcos, TX Metro Area

    CBSA 12420
    6.12 cents/kWh7 of 504%3.6%Texas

    Boston-Cambridge-Newton, MA-NH Metro Area

    CBSA 14460
    18.19 cents/kWh43 of 504.3%4.5%Massachusetts

    Charlotte-Concord-Gastonia, NC-SC Metro Area

    CBSA 16740
    7.77 cents/kWh13 of 503.7%4.2%North Carolina

    Chicago-Naperville-Elgin, IL-IN Metro Area

    CBSA 16980
    8.83 cents/kWh38 of 504.9%4.7%Illinois

    Columbus, OH Metro Area

    CBSA 18140
    7.1 cents/kWh39 of 503.2%4.5%Ohio

    Dallas-Fort Worth-Arlington, TX Metro Area

    CBSA 19100
    6.12 cents/kWh7 of 504.6%4.2%Texas

    Denver-Aurora-Centennial, CO Metro Area

    CBSA 19740
    8.62 cents/kWh33 of 504.1%4%Colorado

    Indianapolis-Carmel-Greenwood, IN Metro Area

    CBSA 26900
    8.15 cents/kWh10 of 503.4%3.8%Indiana

    Kansas City, MO-KS Metro Area

    CBSA 28140
    7.87 cents/kWh12 of 503.8%4.3%Missouri

    Las Vegas-Henderson-North Las Vegas, NV Metro Area

    CBSA 29820
    8.64 cents/kWh20 of 505.4%5.9%Nevada

    Miami-Fort Lauderdale-West Palm Beach, FL Metro Area

    CBSA 33100
    8.5 cents/kWh5 of 503.7%3.5%Florida

    Minneapolis-St. Paul-Bloomington, MN-WI Metro Area

    CBSA 33460
    9.15 cents/kWh44 of 504.4%3.8%Minnesota

    Nashville-Davidson--Murfreesboro--Franklin, TN Metro Area

    CBSA 34980
    6.21 cents/kWh8 of 503%3.3%Tennessee

    Orlando-Kissimmee-Sanford, FL Metro Area

    CBSA 36740
    8.5 cents/kWh5 of 504.7%4.1%Florida

    Phoenix-Mesa-Chandler, AZ Metro Area

    CBSA 38060
    7.9 cents/kWh14 of 504.8%4.3%Arizona

    Pittsburgh, PA Metro Area

    CBSA 38300
    7.87 cents/kWh36 of 503.7%4.6%Pennsylvania

    Portland-Vancouver-Hillsboro, OR-WA Metro Area

    CBSA 38900
    8.05 cents/kWh35 of 504.9%5.2%Oregon

    Raleigh-Cary, NC Metro Area

    CBSA 39580
    7.77 cents/kWh13 of 503.2%3.4%North Carolina

    Salt Lake City-Murray, UT Metro Area

    CBSA 41620
    7.86 cents/kWh15 of 503.5%3.7%Utah

    San Antonio-New Braunfels, TX Metro Area

    CBSA 41700
    6.12 cents/kWh7 of 504.7%4.2%Texas

    San Diego-Chula Vista-Carlsbad, CA Metro Area

    CBSA 41740
    21.53 cents/kWh48 of 504.7%5%California

    Seattle-Tacoma-Bellevue, WA Metro Area

    CBSA 42660
    6.61 cents/kWh45 of 505%4.6%Washington

    Tampa-St. Petersburg-Clearwater, FL Metro Area

    CBSA 45300
    8.5 cents/kWh5 of 504.8%4.1%Florida

    A low unemployment rate indicates a tight labor market, which can make hiring harder. It is shown for context, not ranked.

    Market fundamentals · H1 2026

    Capacity Is the Constraint, Not Business Climate

    This topic is organized around power availability and deliverable capacity. The figures below are published market-wide findings, not estimates, and no composite ranking is published.

    IndicatorValueReading
    Primary market vacancy rate1.4%Record low across primary markets.
    Share of under-construction capacity preleased80.4%Capacity is committed before delivery.
    Future capacity available, all primary marketsUnder 1,500 MWRoughly six months of demand at the current absorption rate.
    Investor survey selection, CBRE 2026Dallas-Fort Worth, 78%Northern Virginia second at 72%.

    Source: CBRE North America Data Center Trends, H1 2026. Report. Vintage: H1 2026.

    Market capacity detail

    MarketInventory (MW)Under construction (MW)YoYVacancyPreleasingAsking rate ($/kW/mo)Note
    Northern Virginia4,496.52,420.2Not available0.2%Not availableNot availableLargest inventory in North America; vacancy effectively nil.
    AtlantaNot available2,88252.3%Not availableNot availableNot availableLargest active construction market in North America in H1 2026.
    Dallas-Fort WorthNot availableNot availableNot availableNot availableNot availableNot availableCBRE's 2026 investor survey: 78% selected Dallas-Fort Worth as most attractive, ahead of Northern Virginia at 72%.
    PhoenixNot availableNot availableNot availableNot availableNot availableNot available
    ChicagoNot availableNot availableNot availableNot availableNot availableNot available

    Source: CBRE North America Data Center Trends, H1 2026. Every figure carries the H1 2026 vintage. Cells reading "Not available" are not published for that market at this vintage and are not estimated.

    Power and incentive position by metro

    MetroStateIndustrial power priceRTO/ISO or balancing authorityData center incentive status
    AtlantaGeorgia7.21 cents/kWhSouthern Company Services balancing authorityStatutory sales and use tax exemption program for qualifying data centers
    AustinTexas6.12 cents/kWhERCOTStatutory sales and use tax exemption program for qualifying data centers
    BostonMassachusetts18.19 cents/kWhISO New EnglandNo dedicated statewide data center tax exemption program
    CharlotteNorth Carolina7.77 cents/kWhDuke Energy Carolinas balancing authorityStatutory sales tax exemption for qualifying data centers
    ChicagoIllinois8.83 cents/kWhPJM InterconnectionStatutory data center investment tax exemption program
    ColumbusOhio7.1 cents/kWhPJM InterconnectionStatutory sales tax exemption for qualifying data center equipment
    DallasTexas6.12 cents/kWhERCOTStatutory sales and use tax exemption program for qualifying data centers
    DenverColorado8.62 cents/kWhPublic Service Company of Colorado balancing authorityNo dedicated statewide data center tax exemption program
    IndianapolisIndiana8.15 cents/kWhMISOStatutory sales tax exemption for qualifying data centers
    Kansas CityMissouri7.87 cents/kWhSouthwest Power PoolStatutory sales and use tax exemption for qualifying data centers
    Las VegasNevada8.64 cents/kWhNevada Power balancing authorityStatutory sales and property tax abatement program for data centers
    MiamiFlorida8.5 cents/kWhFlorida Power & Light balancing authorityStatutory sales tax exemption for qualifying data centers
    MinneapolisMinnesota9.15 cents/kWhMISOStatutory sales tax exemption for qualifying data centers
    NashvilleTennessee6.21 cents/kWhTennessee Valley Authority balancing authorityStatutory sales tax exemption for qualifying data centers
    OrlandoFlorida8.5 cents/kWhDuke Energy Florida balancing authorityStatutory sales tax exemption for qualifying data centers
    PhoenixArizona7.9 cents/kWhArizona Public Service and Salt River Project balancing authoritiesComputer Data Center Program (transaction privilege and use tax relief)
    PittsburghPennsylvania7.87 cents/kWhPJM InterconnectionStatutory sales and use tax refund program for data centers
    PortlandOregon8.05 cents/kWhPortland General Electric and Bonneville Power Administration balancing authoritiesEnterprise zone property tax abatements applied to data centers
    RaleighNorth Carolina7.77 cents/kWhDuke Energy Progress balancing authorityStatutory sales tax exemption for qualifying data centers
    Salt Lake CityUtah7.86 cents/kWhPacifiCorp East balancing authorityStatutory sales tax exemption for qualifying data center purchases
    San AntonioTexas6.12 cents/kWhERCOTStatutory sales and use tax exemption program for qualifying data centers
    San DiegoCalifornia21.53 cents/kWhCalifornia ISONo dedicated statewide data center tax exemption program
    SeattleWashington6.61 cents/kWhBonneville Power Administration and Puget Sound Energy balancing authoritiesStatutory sales and use tax exemption for qualifying data centers (eligibility is geographically limited)
    TampaFlorida8.5 cents/kWhTampa Electric and Duke Energy Florida balancing authoritiesStatutory sales tax exemption for qualifying data centers

    Power price: U.S. Energy Information Administration, Electric Power Annual, Table 2.10 (state average, annual); values not yet ingested read "Not available". Incentive status is shown as statutory context only and must be confirmed directly with the administering state agency.

    Generation queue is not load interconnection

    Generation interconnection and load interconnection are different processes. Berkeley Lab's Queued Up data tracks power plants seeking to connect to the transmission grid — as of the end of 2025, over 2,060 GW were active in those queues, and the median project built in 2025 took more than five years from request to commercial operation. A manufacturing plant or data center instead needs a load connection, governed by the serving utility's tariff and interconnection process. Timelines for load connections are not captured in the queue data and must be confirmed with the utility directly.

    Relevant categories

    What Will Feed This Topic

    An ordered list for data centers will be published once the indicators most relevant to data centers are loaded. Until then, this page shows the underlying data.

    Category or factorCurrent use
    Existing inventory (MW) — CBRE, H1 2026Displayed as a sourced market indicator where available.
    Capacity under construction (MW) — CBRE, H1 2026Displayed as a sourced market indicator where available.
    Vacancy rate — CBRE, H1 2026Displayed as a sourced market indicator where available.
    Preleasing rate — CBRE, H1 2026Displayed as a sourced market indicator where available.
    Average asking rate per kW/month — CBRE, H1 2026Displayed as a sourced market indicator where available.
    State data center tax incentive statusDisplayed as a sourced market indicator where available.
    Industrial retail power price — EIA Electric Power Annual Table 2.10Displayed as a sourced market indicator where available.

    Site-wide methodology and category weights

    Related ranking topics

    TopicStatus
    Best Cities for ManufacturingUnderlying data only
    Best Cities for Logistics & DistributionUnderlying data only
    Best Cities for Industrial GrowthUnderlying data only

    Sources used on this page

    1. U.S. Energy Information Administration. Electric Power Annual, Table 2.10, Year 2024 final.
    2. Tax Foundation. 2026 State Tax Competitiveness Index, 2026 edition (tax systems as of July 1, 2025).
    3. U.S. Bureau of Labor Statistics. Local Area Unemployment Statistics, Metropolitan Area Employment and Unemployment news release, Table 1, Released September 2, 2026; July 2026 preliminary and July 2025 reference months.
    4. CBRE. North America Data Center Trends, H1 2026.
    5. Lawrence Berkeley National Laboratory. Queued Up: Characteristics of Power Plants Seeking Transmission Interconnection, 2026 edition, 2026 edition (queue data through 31 December 2025).
    6. Area Development, 40th Annual Corporate and 22nd Annual Consultant Site Selection Survey, Q1 2026. Category weights only; no composite calculation is published.

    Composite calculations are not published. Figures shown are taken directly from the cited sources without adjustment.

    All figures are reported at the metropolitan statistical area (MSA) level as delineated by the U.S. Office of Management and Budget, not city limits. Where a series is only published at state level, that is stated in the indicator table. Full source provenance and category weights.